From:                              route@monster.com

Sent:                               Friday, August 19, 2016 10:52 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Edward Vasquez 

Last updated:  06/19/16

Job Title:  no specified

Company:  Apeiron, Inc.

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Katy, TX  77449
US

Home: 832 367-5673   
edrvasquez209@gmail.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Edward Vasquez 2016

Resume Value: 4zpq5p6sv2is4kxu   

  

 

Edward R. Vasquez
2719 Frost Gate Ct.
Katy, TX 77449
Phone: (832) 367-5673
Email: edrvasquez209@gmail.com
SUMMARY
To work in a demanding environment that will allow me to utilize my experience in Project
Controls, Planning, Scheduling (Primavera P6 & MS Project), and Progress Reporting as
well work with new scheduling systems and processes
PROFESSIONAL EXPERIENCE
GE Oil & Gas
Houston, TX
10/2009 – Present
- Subsea Systems Engineering - Manufacturing
- Capital Drilling Engineering – Manufacturing
- Master Integrated Scheduling
Engineering Planner / Scheduler
• Initial setup and implementation of Primavera systems & templates
for GE Oil & Gas Drilling
• Led efforts in the setup, implementation, and functional training of Primavera
Project Management System at the GE Brazilian office
• Supported the implementation of the Master Integrated Scheduling system to
plan and track all phases (Commercial, Engineering, and Supply Chain) of larger
Drilling orders
• Data Mining to extract critical data from Supply Chain reports
• Primavera P6 responsibilities included maintaining/updating activities
daily/weekly, recording percentage complete, and adjusting remaining durations
until engineering completion of individual projects
• Led initiative to integrate project schedules between engineering &
manufacturing
• Addition of logic and constraints as needed in the schedule
• Assigning project codes to activities in the schedule
• Maintain a daily Line of Balance of engineering deliverables due, delivered, and
backlogged
• Build project schedules for each incoming order
• Responsible for an average of 30 Capital Drilling project schedules at a time
• Issuing bi-weekly schedules of all projects to engineering leads
• Producing Resource Charts & Histograms
• Produced Monthly engineering reports of Resource Actual Hours charged
cumulative and to each individual project
• Responsible for the reporting of production efficiency for all engineering
resources assigned to the project
• Resource loading and assignment
• Comparison and reporting of baseline and current plans
• Utilize various Excel tools including graphs, logical functions/formulas, sorts, bar
charts, pivot tables, h-lookup, and v-lookup
• Provide Primavera Timesheets support to engineers
• Interface with engineers and leads for schedule updates & status of activity
completion
• Analyze and compare sales system data against P6 schedule data
• Weekly meetings with Sales Coordinators and Engineering leads to properly
status the stages of orders and engineering due dates
• Issued weekly P6 Reports highlighting items due for the current and next week
• Tracking of contractor activity and certification activities
• Keeping management informed of project needs, i.e. unresourced projects
• Assisted in the setup & implementation of Primavera Global & EPS Structure
Fluor Corporation
Sugar Land, TX
8/2006 – 4/2009
- INEOS Project Scotland
- BP Whiting Canadian Crude Project – OSBL & Pipestill EPC
Associate Project Controls Specialist - Scheduler
• Primavera P6 responsibilities included maintaining/updating activities weekly,
recording percentage complete, and adjusting remaining durations until
engineering completion
• Addition of logic and constraints as needed in the schedule
• Assigning project codes to activities in the schedule
• Engineering progress & performance tracking through Fluor EzTrac (SAP
interface)
• Produced Monthly engineering analysis and progress reports in Excel including
multi-formula tables and linked charted worksheets
• Comparison and reporting of baseline, control and forecast plans & curves
• Utilized various Excel tools including graphs, logical functions/formulas, sorts, bar
charts, pivot tables and v-lookup
• Responsible for the reporting of production efficiency for all engineering
disciplines assigned to the project
• Provided installation, licensing and support of the EzTrac in-house progress
tracking system
• Interfaced with Process, Mechanical, Electrical, Piping, and Control Systems,
Civil, Structural, process Graphics and HSE engineering leads for schedule
updates & status of activity completion
• Produced Client reports via imports to Excel from the database
• Analyzed and compared progress data against schedule data
• Associated closely with Document Control to issue the schedule to the client
• Weekly meetings with Procurement and Engineering leads to properly status the
stages of purchase order issue, shipment of equipment, and items received at
site (ex-works and ETA)
• Issued weekly a Material Tracking Report consolidating procurement documents
and highlighting the status of purchase order issue, shipment of equipment, and
items received at site
Furnace Improvements Services Engineering
Sugar Land, TX
3/2005 – 8/2006
- Citgo Corpus Christi Heater Revamp
- Valero Texas City Heater Revamp
- Alon Big Spring Engineering/New Construction of Fired Heater
Project Coordinator
• Responsible for the coordination of projects to rebuild and revamp fired heater
furnaces for various major refineries in the United States.
• MS Project scheduling responsibilities included developing new schedules,
maintaining, updating activities weekly, recording percentage complete, and
adjusting remaining durations until engineering completion for three simultaneous
projects
• Addition of logic and constraints as needed in the schedule
• Interfaced with Process and Mechanical engineers for schedule updates & status
of activity completion
• Procurement of all material required for fabrication/site construction
• Preparing and issuing Purchase Orders for material/labor/shipments
• Constant communication with all vendors/clients involved during expediting
• Arranging logistical OTR shipments of material,
• Meeting with vendors to maintain updated information and pricing
• Accompanied and assisted Engineers on site visitations.
TECHNICAL SKILLS

• Primavera P6 Project Manager
• Primavera P6 Web Access
• Primavera P6 Timesheet Interface
• EzTrac Progress Tracking & Reporting
• Microsoft Excel, Word, Outlook, PowerPoint
• Microsoft Project
• Visio
GENERAL SKILLS
• Communicative Spanish
• Very adaptable & fast learner with new computer programs and systems
• Excellent Communication Skills
• Highly attentive to details
• Self-Motivator
EDUCATION
Sam Houston State University
Huntsville, TX
12/2003
Bachelor Degree of Business Administration
Majored in Management of Information Systems
• President’s Honor Roll for obtaining a semester grade point average of 4.0
• Dean’s List for obtaining a semester grade point average of 4.0
Innovative Management Solutions
Sugarland, TX
5/2013
Advanced Primavera P6 Professional Certificate
VISAS/PASSPORT
• United States Passport
• Brazil Business II Visa
TRAINING
Refining Process Services – Refinery Fired Heaters Course
5/2005
9/2006
Houston Area Contractors Safety Council – Basic Plus Refinery Safety 1/2006
Fluor - Project Controls Course
Fluor - Project Execution Course
Fluor - Fundamentals of Scheduling
Fluor – Cost Management Course
OSHA - Occupational Safety and Health Training
Fluor - Primavera P6 Scheduling Course
10/2006
10/2006
12/2006
2/2007
8/2008



Experience

BACK TO TOP

 

Job Title

Company

Experience

Engineering Planner / Scheduler

GE Oil & Gas/Vecto Gray

- Present

 

Additional Info

BACK TO TOP

 

Desired Salary/Wage:

90,000.00 - 110,000.00 USD yr

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

5+ to 7 Years

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

None

 

 

Target Job:

Target Job Title:

Engineering Planner / Scheduler

Desired Job Type:

Employee
Temporary/Contract/Project

Desired Status:

Full-Time

 

Target Company:

Company Size:

Occupation:

Project/Program Management

·         General/Other: Project/Program Management

 

Target Locations:

Selected Locations:

US-TX-Houston

Relocate:

No

Willingness to travel:

Up to 25% travel

 

Languages:

Languages

Proficiency Level

English

Fluent

Spanish

Intermediate